DOE · DOE-732 · record R3591
Chatlab
Department of Energy · NE INL - NE Idaho National Laboratory (NE)
Chatlab is an AI use case reported by the Department of Energy (NE INL - NE Idaho National Laboratory (NE)) in the OMB 2025 Federal Agency AI Use Case Inventory. It is classified as generative ai, and its reported stage is pilot. The agency lists its topic area as other. Sourcing: contract and in-house. The agency does not designate it as high-impact AI.
Overview
- Development stage
- PilotSource: b) Pilot – The use case has been deployed in a limited test or pilot capacity.
- High-impact designation
- Not high-impactSource: c) Not high-impact
- Impact justification
- Used for general purose generative AI within a COTS product.
- Start date
- Not reported
- Withheld from public reporting
- NoSource: a) No
Mission
- Topic area
- Other
- Operational functions
- No function tag matched Derived by keyword rules; see methodology
Problem the AI is intended to solve
Not available
Expected benefits
Not available
System outputs
Not available
Technology
- AI classification
- Generative AISource: Generative AI: AI that generates new or synthetic content (e.g., images, videos, audio, text, code).
- System name(s)
- Not reported
- Custom-developed code
- Yes
- Public source code
- Not available
Sourcing
- How it was built
- Contract and in-houseSource: c) Developed with both contracting and in-house resources
- Vendor (as reported)
- Not available
- Vendors (standardized)
- None on the standard list
A vendor is the supplier named by the agency. It does not identify the underlying model or AI technology.
Data and privacy
- Involves PII
- No
- Privacy Impact Assessment
- Not reported
- Authorization to Operate
- No
- Demographic features
- Not reported
- Training and evaluation data
- Not available
- Federal Data Catalog
- Not available
Governance
0 of 8 minimum-practice questions answered. A blank answer means the agency reported nothing; it does not mean the practice is absent.
Pre-deployment testingNo answer reported
AI impact assessmentNo answer reported
Independent reviewNo answer reported
Ongoing monitoringNo answer reported
Operator trainingNo answer reported
Fail-safeNo answer reported
Appeal processNo answer reported
User and public consultationNo answer reported
Potential impacts and how they were identified
Not reported